Henny Penny MP-944 Manual do Utilizador Página 11

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 18
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 10
Model MP-941/942/943/944
3-2. OPERATING
CONTROLS AND
COMPONENTS (Continued)
Figure 3-1
3-3. START-UP
Before using the cabinet, it should be thoroughly
cleaned as described in the cleaning procedures
section of this manual. To put the cabinet into
operation, move each POWER switch to the ON
position and adjust each control to the appropriate
temperature. The power light should illuminate
indicating that the unit is operating. The operating
temperature of this unit should be achieved in
approximately 30 minutes.
3-2 103
Vista de página 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 17 18

Comentários a estes Manuais

Sem comentários